[ad_1]
Short article content material
- Assessment of Ceres’ reliable oxide electrolysis (SOEC) engineering for use on an industrial scale
- Screening of decreased-price tag inexperienced hydrogen manufacturing with a megawatt program
- Two-year trial to consider put at Bosch’s Stuttgart web-site in Germany
HORSHAM, England — Ceres Electric power Holdings plc, a world-wide chief in gasoline cell and electrochemical engineering, has signed contracts with Linde Engineering and Robert Bosch GmbH (“Bosch”) to begin a collaboration to validate the functionality, charge, and operational functionality of its SOEC technologies.
Post information
The corporations approach to prepare a two-12 months demonstration of a a single-megawatt SOEC procedure, starting up in 2024 and to be positioned at a Bosch web-site in Stuttgart, Germany. Its aim is to showcase that the know-how gives a highly effective pathway to low-cost environmentally friendly hydrogen, which has a significant function to play in more difficult-to-decarbonise industrial sectors.
Ceres has committed £100 million for the advancement of its SOEC technologies. Its 1st 100kW electrolyser module is now on take a look at and preliminary outcomes are delivering self-confidence that this know-how can supply inexperienced hydrogen at <40kWh/kg, around 25% more efficiently than incumbent lower temperature technologies.
Linde Engineering has world-leading capabilities in industrial process engineering of chemical plants and a global footprint in industrial facilities. Coupled with Bosch’s significant expertise in product industrialisation and mass manufacturing, the companies are aiming to evaluate and qualify SOEC technology for large scale industrial applications.
The SOEC programme builds on Bosch’s experience of Ceres’ solid oxide fuel technology (SOFC) and the technology shares the same material sets, manufacturing process, equipment, and stack design. The demonstration represents an important validation of SOEC at a system level, which is a relevant basis for potential commercialisation.
Phil Caldwell, Chief Executive Officer of Ceres, commented: “The vision for our partnership with Linde Engineering and Bosch is to set a new industry standard for solid oxide electrolysers, leading to widespread adoption in industrial applications. By combining Ceres’ unique technology, Bosch’s strength in scaled manufacturing and Linde Engineering’s solid expertise hydrogen production, processing, distribution and storage, we will establish a partnership that can make our technology even more competitive and prepare it for mass market adoption at scale.”
For further information visit www.ceres.tech.
View source version on businesswire.com: https://www.businesswire.com/news/home/20230316005133/en/
Contacts
Ceres Power Holdings plc
Elizabeth Skerritt
Tel: +44(0)7932 023 283
#distro
[ad_2]
Source link
